⚠️ 文本暂未汉化
暂无人汉化此页面 想要参与汉化?
Impact I | |
---|---|
Manufacturer | 铝热公司 (THCN) |
Size | 1 |
Grade | A |
Base price | 57,750 aUEC |
Range | |
Optimal range | 30 m |
Maximum range | 150 m |
Mining efficiency | |
Extraction throughput | 0.45 SCU/s |
Power transfer | 2,200 |
Instability | 10% |
Resistance | −25% |
Catastrophic charge rate | 50% |
Optimal charge window size | 30% |
Shatter damage | 75% |
Consumables | |
Consumable slots | 3 |
The Impact I is a mining laser manufactured by 铝热公司.
In-game description
Mine difficult deposits easier and faster with the Impact I. Thermyte Concern created special focus lenses to increase the laser's power and provide the precision required for a larger optimal charge window. This powerful mining laser does require careful management, as deposits will overheat quicker and explode with more force.[1]
Buyable at
Last updated with info from patch 3.16.
Location | Store | Price (aUEC) |
---|---|---|
罗威尔 | Tammany and Sons | 57,750 |
ARC-L1 | 57,750 | |
新巴贝奇 | 舒宾星际 | 57,750 |
18区 | Dumper's Depot | 57,750 |
Grim HEX | Dumper's Depot | 57,750 |
奥丽莎空间站 | Dumper's Depot | 57,750 |
References
- ↑ Tammany and Sons 2020-01-02