切換選單
切換偏好設定選單
切換個人選單
尚未登入
若您做出任何編輯,會公開您的 IP 位址。

NewDawn

Size 3 grade C civilian power plant manufactured by 櫻日集團


NewDawn
Manufacturer櫻日集團 (SASU)
SizeLarge ({{#external_value:Size}})
TypeCivilian (C)
Mass{{#external_value:Mass}} kg
Hit points{{#external_value:HP}}
UEC cost80,100 UEC
Stats
Power supply{{#external_value:PowerDraw}} pwr/s
Wear time{{#external_value:WearTime}} h

[[Category:Size {{#external_value:Size}} power plants]]

The 櫻日集團 NewDawn is a size 3 grade C civilian power plant.

Product description

The NewDawn was appropriately named, as it was the first large power plant built by Sakura Sun. Following its commercial success, the company decided to expand and improve upon their line of large power plants.[1]

References

Cookies 幫助我們給予服務內容。依您有使用我們的服務,代表您同意我們使用 cookies。